128 Second St. NW, Barberton, OH 44203

Connecting to the TowPath in Barberton

by Ruth Kaser for Towpath News

Don and I noted a bridge deck by the construction site of the new connecting bridge at Robinson Avenue. I felt the need to check the progress of bridge so we swung by the site this morning to complete our ride.

Below are pictures of the crew preparing the bridge to be installed. WAKR reported that it is being installed today.

 

the preparation of the area to receive the new bridge

the destination of the new bridge


the pedestrian bridge

the pedestrian bridge


the pedestrian bridge

the pedestrian bridge


the pedestrian bridge

the pedestrian bridge

Back to Top